-- card: 106087 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Using Dates in a Subproject -- part 12 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=84 bottom=462 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 15 (button) -- low flags: 00 -- high flags: A003 -- rect: left=16 top=214 right=235 bottom=215 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Calculating Project Family Dates ----- HyperTalk script ----- on mouseUp go card id 96261 end mouseUp -- part 17 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=82 right=240 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: TextField2 -- part contents for background part 6 ----- text ----- You can create subprojects without any set dates in them. This way, the subprojects can be linked to supertasks in a number of different master projects or to more than one supertask within a single master project. Any dates you set override the dates MacProject II calculates, as in any other project. You should set dates only if necessary. -- part contents for background part 27 ----- text ----- Subproject Dates & Durations -- part contents for background part 28 ----- text ----- Using Dates in a Subproject -- part contents for card part 12 ----- text ----- To use dates from the master project: -- part contents for background part 7 ----- text ----- -- part contents for card part 17 ----- text ----- Choose Get Master Project Dates from the Dates menu. Important: Dates from the supertask are not stored in the subproject. They only appear there when you open the subproject from the master project or when you choose Get Master Project Dates. If a subproject is linked to more than one supertask, a dialog box lets you select the supertask whose dates you want to display.